Maintain the correct Parts in stock, at the right time to meet all needs.

Anwer MRP identifies both Purchasing and Manufacturing activity and has to respond to hour-by-hour, day-by-day events together with future planned activity, thus reducing the problems of over stocking unnecessary inventory.

Material Resource Planning at multiple levels is a useful technique for planning and generating several distinct but interrelated items of information:

  • A Purchasing Plan for factored/purchased Raw Materials/Components
  • A Manufacturing Plan for manufactured Intermediates/Assemblies and Finished Goods
  • As an input to a Rough Cut Capacity Plan
  • As an Overlay for Available To Promise enquiries

The allocation of a provisional Vendor enables Vendor Purchase Schedules to be printed and the Portal Vendor enquiries to show planned activity.

Material Resource Planning is used to control finished goods, Intermediate and Manufacture to order products.
Using inputs from other Answer Modules it calculates gross requirements and available to promise figures, resulting in Planned Requirements and associated actions.

K81P MRP Detail Enquiry

Material Resource Planning (MRP) is the module that generates gross requirements as determined by the Master Production Schedule, performs 'net' logic and generates planned Purchase Orders and Work Orders that are necessary in order to satisfy the Master Production Schedule.

The primary goal is to answer the questions:

  • How?
  • When, with respect to Materials Ordering?
  • How much?
  • From whom?

An integral component of Answer Enterprise, MRP integrates with Inventory Management and Warehousing, MPSP and CRP, Sales and Purchasing, Product Definition and Quality Management modules.
It will ensure your high level Product, intermediate and Raw Material/Component demand is managed in the optimal manner for your business.


Key Features
  • Balance supply and demand
  • Plan and control manufacturing and distribution facilities
  • Reduce problems of over stocking unnecessary inventory
  • Generate gross requirements
  • Perform ‘net’ logic
  • Generate planned Purchase Orders and Work Orders
Learn More ...
Download MRP PDF
Download MRP PDF Download MRP PDF


Go to top of the page

For more information:

Answer Solutions Ltd

The Innovation Centre
Festival Drive
Ebbw Vale
Blaenau Gwent
United Kingdom
NP23 8XA

Tel: +44 (1495) 356771
Fax: +44 (1495) 356774
Email: info@answersolutions.com